Description

Newly built residential building with apartments and parking spaces in Varna, Vinitsa district   

Location

The building is located in a quiet and peaceful place, in one of the most preferred areas for living in Varna - the Vinitsa district. There is excellent infrastructure: supermarkets and shops, restaurants, a school, a kindergarten and playgrounds, 2 medical centers, a veterinary clinic, pharmacies, gas stations, a bank branch, and a horse farm. The Vinitsa district is served by bus routes with numbers: 29, 31, 31a.

Apartments in the area are in high demand for rent and sale. The Vinitsa quarter is located in close proximity to the famous resort of St. St. Constantine and Elena, known for its clean sandy beaches, mineral springs and beautiful atmosphere.

Description of the property

According to the project, 23 apartments are planned in the building, located on 4 floors. The first three floors are of the same type: 4 apartments with one bedroom and 3 apartments with two bedrooms. On the fourth floor there are 2 apartments with two bedrooms. There will be 7 garages located in the semi-underground level. For convenience, there are 21 open parking spaces in the yard - prices start from 5,000 euros.

Construction characteristics

Common parts: porcelain tile finish; Corridors, kitchen area and rooms: floor - cement screed, walls - white gypsum plaster, ceiling - gypsum putty; Bathroom: walls and ceiling - plaster, floor - screed, no plumbing; Electrical communications: 100% completed (plus electric meter); Water supply: with installed main water meter, internal wiring;

Windows profile Rehau, Euro Design, 70 mm., 5-chamber double-glazed windows – 24 mm 4 mm white + 4 mm energy The entrance door is armored. All common parts of the building will be finished to a high quality. Wiring for air conditioners has been installed in all rooms.

Construction time

Start of construction: October 2023

Construction period: 18 months.

Buyer commission: 3%

 

 

 

 

 

 